Sign In Register

Tempe, AZ

Full City Profile · Arizona · Maricopa County County

3.4 /5.0
B Good
186,419 Population 4,663/sq mi density
$77,643 Median Income $42,371 per capita
$421,900 Home Value $466,198 Zillow
$1,623 Median Rent 30.9% income on rent
75°F Avg Temperature 347 sunny days/yr
452 Violent Crime/100K 3,776 property/100K
B
Overall
3.4 / 5.0
Good overall score based on economy, affordability, safety and education
A
Economy
4.1 / 5.0
$77,643 median income, 4.0% unemployment
B+
Affordability
3.6 / 5.0
$421,900 home value, $1,623/mo rent
F
Safety
1.0 / 5.0
452 violent crimes/100K (19% above avg)
A+
Education
5.0 / 5.0
49.5% bachelor's degree or higher

Bridges in Tempe (191)

Concrete continuous · Slab
State Highway
Good Built 1977 Rebuilt 1993 108 ft 246,297 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Multiple)
State Highway
Good Built 1981 213 ft 242,887 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Multiple)
State Highway
Fair Built 1993 Rebuilt 2009 1,029 ft 224,918 vehicles/day
Deck: 6 · Super: 7 · Sub: 7
Prestressed concrete · Box Beam (Multiple)
State Highway
Good Built 1994 Rebuilt 2010 201 ft 224,918 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Good Built 1994 Rebuilt 2010 1,008 ft 195,059 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Prestressed concrete · Box Beam (Single/Spread)
State Highway
Good Built 1993 Rebuilt 2009 74 ft 188,424 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete · Box Beam (Single/Spread)
State Highway
Good Built 1993 Rebuilt 2009 74 ft 188,424 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete · Box Beam (Single/Spread)
State Highway
Good Built 1993 Rebuilt 2012 126 ft 188,424 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Multiple)
State Highway
Good Built 1992 Rebuilt 2015 165 ft 171,747 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Multiple)
State Highway
Good Built 1993 Rebuilt 2015 177 ft 159,200 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1989 Rebuilt 2012 295 ft 154,551 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete · Box Beam (Single/Spread)
State Highway
Fair Built 1989 Rebuilt 2012 158 ft 140,284 vehicles/day
Deck: 6 · Super: 7 · Sub: 7
Prestressed concrete · Box Beam (Single/Spread)
State Highway
Good Built 1995 170 ft 124,276 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Fair Built 1990 Rebuilt 2012 1,161 ft 110,587 vehicles/day
Deck: 6 · Super: 7 · Sub: 7
Concrete · Frame
State Highway
Fair Built 1998 61 ft 98,075 vehicles/day
Deck: 6 · Super: 6 · Sub: 6
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1999 170 ft 97,538 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1998 166 ft 97,538 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Good Built 1999 1,223 ft 97,118 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1997 169 ft 89,200 vehicles/day
Deck: 7 · Super: 6 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 2000 160 ft 89,200 vehicles/day
Deck: 7 · Super: 6 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Good Built 1994 Rebuilt 2009 5,171 ft 87,767 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1997 Rebuilt 2015 222 ft 87,705 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete continuous · Culvert
State Highway
Good Built 1992 25 ft 86,846 vehicles/day
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1997 Rebuilt 2015 223 ft 83,883 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Fair Built 1994 Rebuilt 2009 5,292 ft 82,842 vehicles/day
Deck: 7 · Super: 5 · Sub: 7
Prestressed concrete · Box Beam (Single/Spread)
State Highway
Good Built 1984 212 ft 81,000 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1990 374 ft 79,477 vehicles/day
Deck: 7 · Super: 7 · Sub: 6
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1990 Rebuilt 2009 324 ft 78,171 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete continuous · Culvert
State Highway
Good Built 1991 52 ft 76,800 vehicles/day
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Good Built 1997 1,223 ft 74,629 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Good Built 2001 Rebuilt 2016 247 ft 73,916 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete · Box Beam (Single/Spread)
State Highway
Good Built 1998 Rebuilt 2015 187 ft 73,916 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1992 154 ft 72,523 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1992 307 ft 72,523 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1992 203 ft 72,523 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1990 181 ft 72,523 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1990 Rebuilt 2010 181 ft 70,671 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1992 Rebuilt 2012 154 ft 70,671 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1992 Rebuilt 2012 342 ft 70,671 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1992 Rebuilt 2012 203 ft 70,671 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1992 Rebuilt 2009 216 ft 69,685 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Good Built 1991 Rebuilt 2012 418 ft 69,685 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1991 Rebuilt 2012 271 ft 69,685 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1977 Rebuilt 1993 160 ft 67,303 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1998 163 ft 67,303 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1990 242 ft 66,848 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Fair Built 1997 Rebuilt 2015 158 ft 59,461 vehicles/day
Deck: 6 · Super: 7 · Sub: 7
Prestressed concrete · Box Beam (Single/Spread)
State Highway
Good Built 1999 125 ft 58,641 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1997 282 ft 58,641 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1992 216 ft 53,668 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Good Built 1991 418 ft 53,668 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1991 271 ft 53,668 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1994 681 ft 49,713 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete · Box Beam (Single/Spread)
State Highway
Good Built 1995 125 ft 48,875 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1997 282 ft 48,875 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Good Built 1990 493 ft 46,889 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
City/Municipal
Fair Built 1981 1,333 ft 43,562 vehicles/day
Deck: 6 · Super: 7 · Sub: 7
Prestressed concrete · Box Beam (Single/Spread)
City/Municipal
Good Built 1991 181 ft 42,917 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1978 238 ft 40,979 vehicles/day
Deck: 6 · Super: 7 · Sub: 7
Concrete continuous · Culvert
State Highway
Good Built 1978 32 ft 39,800 vehicles/day
Concrete continuous · Slab
State Highway
Good Built 1993 108 ft 39,736 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1978 Rebuilt 2003 238 ft 38,940 vehicles/day
Deck: 6 · Super: 6 · Sub: 7
Concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1975 209 ft 38,919 vehicles/day
Deck: 5 · Super: 5 · Sub: 6
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Fair Built 1997 Rebuilt 2015 157 ft 38,614 vehicles/day
Deck: 7 · Super: 8 · Sub: 6
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1994 Rebuilt 2000 2,095 ft 38,554 vehicles/day
Deck: 7 · Super: 5 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Good Built 1991 271 ft 38,486 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1990 295 ft 38,426 vehicles/day
Deck: 6 · Super: 6 · Sub: 7
Concrete continuous · Slab
City/Municipal
Fair Built 1974 Rebuilt 2014 216 ft 36,841 vehicles/day
Deck: 5 · Super: 5 · Sub: 7
Concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1975 209 ft 36,307 vehicles/day
Deck: 5 · Super: 5 · Sub: 6
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1977 227 ft 35,360 vehicles/day
Deck: 6 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1997 239 ft 34,657 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete continuous · Culvert
State Highway
Good Built 1977 32 ft 34,500 vehicles/day
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1995 3,096 ft 34,139 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1970 193 ft 33,902 vehicles/day
Deck: 5 · Super: 5 · Sub: 6
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1990 285 ft 33,221 vehicles/day
Deck: 6 · Super: 7 · Sub: 7
Concrete continuous · Slab
City/Municipal
Fair Built 1974 Rebuilt 2014 216 ft 33,192 vehicles/day
Deck: 5 · Super: 5 · Sub: 7
Concrete continuous · Slab
City/Municipal
Fair Built 1927 Rebuilt 1990 73 ft 30,080 vehicles/day
Deck: 5 · Super: 5 · Sub: 6
Concrete continuous · Culvert
State Highway
Good Built 1978 32 ft 29,525 vehicles/day
Concrete continuous · Slab
City/Municipal
Fair Built 1940 Rebuilt 1973 42 ft 27,773 vehicles/day
Deck: 5 · Super: 5 · Sub: 6
Concrete continuous · Slab
City/Municipal
Fair Built 1974 Rebuilt 1986 54 ft 26,785 vehicles/day
Deck: 6 · Super: 6 · Sub: 8
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1992 265 ft 26,400 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1990 315 ft 26,060 vehicles/day
Deck: 6 · Super: 7 · Sub: 6
Concrete continuous · Slab
City/Municipal
Fair Built 1973 Rebuilt 1986 37 ft 26,048 vehicles/day
Deck: 6 · Super: 6 · Sub: 8
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1990 344 ft 25,934 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
City/Municipal
Good Built 1990 289 ft 25,366 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
City/Municipal
Good Built 1990 289 ft 25,366 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
City/Municipal
Fair Built 1990 973 ft 25,366 vehicles/day
Deck: 7 · Super: 7 · Sub: 6
Prestressed concrete continuous · Stringer/Multi-beam
City/Municipal
Fair Built 1990 973 ft 25,366 vehicles/day
Deck: 6 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1999 190 ft 24,878 vehicles/day
Deck: 7 · Super: 7 · Sub: 6
Prestressed concrete · Stringer/Multi-beam
City/Municipal
Fair Built 1996 90 ft 24,333 vehicles/day
Deck: 5 · Super: 7 · Sub: 7
Prestressed concrete · Box Beam (Multiple)
City/Municipal
Fair Built 1992 106 ft 24,163 vehicles/day
Deck: 5 · Super: 7 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
City/Municipal
Fair Built 1984 1,184 ft 24,065 vehicles/day
Deck: 6 · Super: 7 · Sub: 7
Concrete continuous · Culvert
City/Municipal
Fair Built 1969 Rebuilt 1981 21 ft 22,680 vehicles/day
Prestressed concrete · Box Beam (Multiple)
City/Municipal
Fair Built 1977 43 ft 22,188 vehicles/day
Deck: 6 · Super: 6 · Sub: 5
Prestressed concrete · Box Beam (Multiple)
City/Municipal
Fair Built 1992 47 ft 22,174 vehicles/day
Deck: 6 · Super: 6 · Sub: 8
Concrete continuous · Slab
County Highway
Good Built 1962 36 ft 22,019 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete continuous · Culvert
County Highway
Good Built 1997 20 ft 21,942 vehicles/day
Concrete continuous · Culvert
City/Municipal
Good Built 1967 Rebuilt 1998 32 ft 21,933 vehicles/day
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Good Built 1997 1,883 ft 21,259 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1997 1,701 ft 20,922 vehicles/day
Deck: 7 · Super: 6 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1999 216 ft 20,300 vehicles/day
Deck: 7 · Super: 6 · Sub: 6
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1991 Rebuilt 2012 184 ft 19,807 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1999 252 ft 19,800 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
City/Municipal
Good Built 1996 315 ft 19,652 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Good Built 2000 1,556 ft 19,592 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1997 301 ft 19,592 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1997 2,290 ft 19,036 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
City/Municipal
Good Built 1996 1,272 ft 18,612 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete continuous · Slab
City/Municipal
Fair Built 1975 Rebuilt 1993 77 ft 18,327 vehicles/day
Deck: 5 · Super: 5 · Sub: 7
Prestressed concrete · Box Beam (Multiple)
City/Municipal
Good Built 1979 66 ft 18,132 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete · Box Beam (Single/Spread)
City/Municipal
Good Built 1996 143 ft 18,130 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Good Built 1982 1,348 ft 17,954 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Good Built 1997 738 ft 17,717 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete · Stringer/Multi-beam
City/Municipal
Fair Built 2007 90 ft 17,194 vehicles/day
Deck: 7 · Super: 7 · Sub: 6
Concrete continuous · Culvert
State Highway
Good Built 1998 39 ft 16,861 vehicles/day
Concrete · Box Beam (Multiple)
Bureau of Indian Affairs
Good Built 2005 74 ft 15,975 vehicles/day
Deck: 7 · Super: 8 · Sub: 8
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1991 681 ft 15,896 vehicles/day
Deck: 7 · Super: 5 · Sub: 6
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1989 331 ft 15,642 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1990 296 ft 15,642 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1989 235 ft 15,642 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete continuous · Culvert
State Highway
Good Built 1998 37 ft 15,555 vehicles/day
Concrete continuous · Slab
County Highway
Fair Built 1966 50 ft 15,500 vehicles/day
Deck: 5 · Super: 5 · Sub: 6
Concrete continuous · Slab
County Highway
Fair Built 1966 50 ft 15,500 vehicles/day
Deck: 5 · Super: 5 · Sub: 5
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1989 316 ft 15,263 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete continuous · Slab
City/Municipal
Fair Built 1973 82 ft 14,606 vehicles/day
Deck: 5 · Super: 5 · Sub: 8
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1998 843 ft 13,905 vehicles/day
Deck: 7 · Super: 6 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1997 584 ft 13,888 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1990 192 ft 12,967 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1990 192 ft 12,967 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete continuous · Culvert
City/Municipal
Fair Built 1932 Rebuilt 1962 21 ft 12,870 vehicles/day
Concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1969 205 ft 12,766 vehicles/day
Deck: 5 · Super: 5 · Sub: 7
Concrete continuous · Frame
City/Municipal
Fair Built 1975 144 ft 11,903 vehicles/day
Deck: 7 · Super: 7 · Sub: 6
Prestressed concrete continuous · Box Beam (Multiple)
County Highway
Fair Built 1980 936 ft 11,894 vehicles/day
Deck: 5 · Super: 5 · Sub: 5
Prestressed concrete continuous · Box Beam (Multiple)
County Highway
Fair Built 1980 410 ft 11,894 vehicles/day
Deck: 5 · Super: 5 · Sub: 5
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1997 238 ft 11,853 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete continuous · Culvert
State Highway
Good Built 1978 32 ft 11,400 vehicles/day
Concrete continuous · Slab
City/Municipal
Fair Built 1954 Rebuilt 1974 63 ft 10,800 vehicles/day
Deck: 6 · Super: 6 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1977 227 ft 10,653 vehicles/day
Deck: 6 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1978 238 ft 10,618 vehicles/day
Deck: 6 · Super: 6 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1995 245 ft 10,344 vehicles/day
Deck: 8 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1997 340 ft 10,344 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Concrete · Frame
City/Municipal
Fair Built 1975 46 ft 9,904 vehicles/day
Deck: 6 · Super: 6 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1993 225 ft 9,813 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1994 314 ft 9,813 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Prestressed concrete continuous · Stringer/Multi-beam
State Highway
Fair Built 2011 1,672 ft 9,712 vehicles/day
Deck: 6 · Super: 8 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 2000 292 ft 9,543 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete continuous · Culvert
State Highway
Good Built 1992 25 ft 9,500 vehicles/day
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1994 497 ft 9,409 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
City/Municipal
Good Built 1994 1,510 ft 9,235 vehicles/day
Deck: 7 · Super: 7 · Sub: 8
Concrete · Frame
City/Municipal
Good Built 1994 78 ft 9,235 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete · Box Beam (Single/Spread)
State Highway
Good Built 1993 128 ft 8,922 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete continuous · Slab
City/Municipal
Good Built 1968 43 ft 8,519 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1988 Rebuilt 2008 235 ft 7,980 vehicles/day
Deck: 6 · Super: 7 · Sub: 7
Concrete · Arch (Deck)
City/Municipal
Fair Built 1931 Rebuilt 1994 1,577 ft 7,578 vehicles/day
Deck: 5 · Super: 5 · Sub: 6
Prestressed concrete · Box Beam (Single/Spread)
State Highway
Fair Built 1995 115 ft 7,538 vehicles/day
Deck: 7 · Super: 6 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1988 Rebuilt 2008 235 ft 7,351 vehicles/day
Deck: 6 · Super: 7 · Sub: 7
Prestressed concrete · Box Beam (Single/Spread)
State Highway
Fair Built 1995 115 ft 7,173 vehicles/day
Deck: 7 · Super: 6 · Sub: 7
Steel · Culvert
State Highway
Good Built 2012 36 ft 7,000 vehicles/day
Concrete · Frame
State Highway
Good Built 1998 44 ft 6,779 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1990 123 ft 6,733 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1993 281 ft 6,006 vehicles/day
Deck: 7 · Super: 8 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1988 269 ft 6,000 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete · Frame
City/Municipal
Fair Built 1975 46 ft 5,683 vehicles/day
Deck: 6 · Super: 6 · Sub: 6
Concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1969 205 ft 5,602 vehicles/day
Deck: 6 · Super: 5 · Sub: 6
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1990 386 ft 5,187 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1978 247 ft 5,128 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete continuous · Culvert
State Highway
Good Built 1978 32 ft 4,800 vehicles/day
Prestressed concrete continuous · Box Beam (Single/Spread)
City/Municipal
Good Built 1991 310 ft 4,647 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
City/Municipal
Good Built 1993 240 ft 4,541 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete continuous · Culvert
State Highway
Good Built 1993 43 ft 2,500 vehicles/day
Concrete continuous · Slab
City/Municipal
Fair Built 1973 66 ft 2,233 vehicles/day
Deck: 6 · Super: 6 · Sub: 6
Prestressed concrete · Box Beam (Single/Spread)
City/Municipal
Good Built 1996 176 ft 2,109 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 2001 221 ft 2,090 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete continuous · Box Beam (Single/Spread)
City/Municipal
Fair Built 1990 164 ft 2,010 vehicles/day
Deck: 7 · Super: 7 · Sub: 6
Concrete continuous · Culvert
State Highway
Good Built 1992 40 ft 2,000 vehicles/day
Concrete continuous · Culvert
State Highway
Good Built 1993 26 ft 2,000 vehicles/day
Concrete continuous · Slab
City/Municipal
Fair Built 1973 71 ft 1,446 vehicles/day
Deck: 6 · Super: 6 · Sub: 7
Concrete continuous · Slab
City/Municipal
Fair Built 1973 71 ft 1,343 vehicles/day
Deck: 6 · Super: 6 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1990 192 ft 1,297 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Good Built 1990 192 ft 1,297 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete · Tee Beam
City/Municipal
Fair Built 1971 76 ft 1,195 vehicles/day
Deck: 6 · Super: 7 · Sub: 7
Steel continuous · Stringer/Multi-beam
City/Municipal
Fair Built 1953 170 ft 1,047 vehicles/day
Deck: 5 · Super: 6 · Sub: 6
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1999 212 ft 1,000 vehicles/day
Deck: 6 · Super: 6 · Sub: 7
Prestressed concrete · Box Beam (Multiple)
City/Municipal
Fair Built 1979 35 ft 800 vehicles/day
Deck: 6 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1997 212 ft 500 vehicles/day
Deck: 7 · Super: 6 · Sub: 7
Concrete · Tee Beam
City/Municipal
Good Built 2011 51 ft 500 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Concrete continuous · Slab
City/Municipal
Fair Built 1974 42 ft 250 vehicles/day
Deck: 6 · Super: 6 · Sub: 8
Prestressed concrete · Box Beam (Multiple)
City/Municipal
Fair Built 2004 95 ft 200 vehicles/day
Deck: 7 · Super: 6 · Sub: 7
Concrete continuous · Culvert
State Highway
Good Built 1998 26 ft 10 vehicles/day
Prestressed concrete · Stringer/Multi-beam
City/Municipal
Good Built 1986 48 ft 10 vehicles/day
Deck: 7 · Super: 7 · Sub: 7
Prestressed concrete continuous · Box Beam (Single/Spread)
State Highway
Fair Built 1999 212 ft 5 vehicles/day
Deck: 7 · Super: 5 · Sub: 7